适用于
|
所需工具
数量 | 部件号 | 描述 | |
---|---|---|---|
1 | ![]() | 8710-0510 | 开口扳手 1/4-5/16 英寸 |
1 | ![]() | 8710-1924 | 开口扳手 14 mm |
1 | ![]()
|
| 镊子 , OR |
1 | ![]()
|
| 牙签 |
所需部件
数量 | 部件号 | 描述 | |
---|---|---|---|
1 | ![]() | 5067-6595 | 1260 PV O-ring FKM 5/pack |
1 | ![]() | 01018-22707 | PTFE 滤芯(每包 5 个) (optional) |
1 | ![]() | 5067-4728 | 密封盖组件 (optional) |
前提条件
|
Disassemble the purge valve.
Remove the old o-ring from the purge valve.
Clean the purge valve parts.
Place the new o-ring on the Screw Purge Valve.
Place the screw with o-ring on the Purge Valve Body.
Place the mounting ring on the screw and push down the o-ring.
Push the screw up and guide the o-ring into the gap.
Place a new frit into the purge valve with the orientation of the frit as shown below (slit in frit points to the front). Reinstall the seal cap including the gold seal.
注意
Before reinstallation always check the gold seal in the seal cap. A deformed seal cap should be exchanged.
Install the purge valve to the pump. Make sure not to turn the purge valve body when the screw is fixed to the pump. The o-ring will take damage.
运行系统压力测试(请参见系统压力测试)。
base-id: 3821948043
id: 9007203076689035