Locate the stainless steel booster transfer line. Connect one end to the top port of the output tee on the center right side of the booster drawer. Tighten finger tight with an additional 1/8th turn as needed.
This tube can be routed through the tee slots on the side of the SFC control module. The tube is routed upward between the SFC control module and the Agilent 1260 Infinity II/III stack to the bottom side of the binary pump. The tube is then routed horizontally to the bottom center of the binary pump where it can enter the concave opening behind the cover. The tube should then be routed to the left side of the pump beneath channel A (left side). The end of the booster transfer tube can then be installed with the adapter in the passive inlet valve.
Any spare tubing can be located between the SFC control module and HPLC stack.